Every field device, one address space.
MergenHub collects data from PLCs, RTUs and meters over 11 industrial protocols and unifies it in one OPC UA server, REST API and web-based SCADA. From installation to live data in minutes.
No extra runtime on the target machine
Turkish and English UI
Free demo: all features, unlimited tags — runtime runs 2 hours per start, restart for another 2 hours
| Tag | Address | Value | Quality |
|---|
From data acquisition to the operator screen, in one package
Instead of a separately licensed server + SCADA + historian + gateway chain, everything ships in a single installation.
Protocol drivers
Modbus, Siemens S7, OMRON, DNP3, IEC 104, IEC 61850, MQTT and more. Automatic tag discovery and address-format helpers.
OPC UA server
All sources in one address space. Security policies, multiple endpoints, per-user access and proven scale at hundreds of thousands of tags.
Web SCADA / HMI
Drag-and-drop editor in the browser: symbol library, pipes, animations, sub-screens. Mobile-friendly operator view.
Alarms & notifications
Standards-based alarm lifecycle, deadband, history; e-mail and SMS with per-user preferences.
Data logging
SQLite or enterprise database (ODBC), store-and-forward, trend charts, CSV/Excel/PNG export.
IoT bridge
REST server/client and MQTT client agents push data to the cloud or third-party systems.
Virtual tags
Formula engine: average, min/max, cumulative difference, totalizer, conditional logic and function library.
Enterprise authorisation
Users/groups, resource-level access control, HTTPS, audit log and session security.
AI assistant
With the MCP server, AI assistants query the plant in natural language: status, alarms, trends, diagnostics.
Whatever is in the field, it connects
Migrate existing projects in minutes with JSON project import.
Modbus TCP + Serial
FC05/06/22 writes, zero-based addressing, RTU/ASCII, UDP and Modicon bit order.
Details →SiemensSiemens S7
S7-300/400/1200/1500; DB, marker, I/Q areas and optimised access.
Details →OMRONOMRON NJ/NX + FINS
Classic FINS/TCP and NJ/NX EtherNet/IP CIP symbolic access in one driver.
Details →DNP3DNP3
SBO/Direct Operate, Secure Auth, Data Sets, File Control, redundancy, time sync.
Details →IEC 104IEC 60870-5-104
General Interrogation, single/double commands, setpoints and time sync.
Details →IEC 61850IEC 61850 MMS
SCL/ICD import, control model (SBO/direct) and LN-level reads.
Details →MQTTMQTT
Channel-level broker sharing, smart JSON discovery and arrival-watchdog liveness.
Details →Built-in modules in one installation
Server, SCADA, historian and gateway — all inside MergenHub instead of a chain of separately licensed products.
OPC UA Sunucusu
All sources in one address space; multiple endpoints, security policies, 450K+ tag scale.
Details →ArayüzWeb SCADA / HMI
Drag-and-drop editor in the browser, symbol library, animation and mobile operator view.
Details →ISA-18.2Alarm ve Olaylar
Standard alarm lifecycle, deadband, history; e-mail and SMS notifications.
Details →HistorianData Logger
SQLite/ODBC logging, store-and-forward, trend charts, CSV/Excel/PNG export.
Details →GatewayData Bridge
Bridge data to the cloud with REST server/client and MQTT client agents.
Details →HesaplamaVirtual Tags
Formula engine: average, totalizer, cumulative difference, conditional logic and derivative.
Details →Yapay zekâMCP Sunucusu
AI assistants query the plant in natural language; two-tier authorisation, read-only.
Details → SecurityAuthorisation & audit
User/group permissions, resource-level access, HTTPS, audit log.
Features →One platform in the middle
Field protocols on the left, consumers on the right; MergenHub is the single secure hub between them.
- Scan engine · channel isolation
- Virtual tags · alarms · historian
- Authorisation · audit · HTTPS
Inside the product
Real MergenHub screens — click to enlarge.










Field-proven engineering
MergenHub is built on the engineering experience of Envest, a maker of smart metering devices and software for water and energy infrastructure.
Developed in Türkiye
Entirely developed at our R&D centre in Erciyes Technopark. A product whose makers you can reach directly.
Field experience
We are the developers of the Koru1000 water management platform; real deployments in drinking-water and distribution systems.
Enterprise support
Installation, commissioning, training and project consultancy; documentation in Turkish and on-site support options.
Every feature in every package
Packages differ only by the number of tags. Perpetual or annual subscription; the first year of Maintenance & Support is included, and upgrades stay free for the life of the license. Unlicensed installations run in trial mode.
- Online activation with a key, or offline (request file → document)
- Release and move the license to another machine yourself
- Dealer discounts and open account for approved partners
- 2-day refund guarantee
SYSTEM Windows 10/11 · Server 2016+ · 64-bit
SIZE 118.5 MB
FIRST LOGIN admin / admin — changed on first login
Try it in the browser without installing
Let's talk
Write to us for a quote, project consultancy or feedback.
[email protected]
+90 352 224 01 80
Altınoluk Mah. Fatih Sultan Mehmet Bulvarı No:72/2, Melikgazi / Kayseri
AR-GE: Erciyes Teknopark, Tekno-1 Binası No:61/24, Melikgazi / Kayseri
MergenHub